Schwinny
I live for the CABE
For the Collective.
I'm going to run this for 6 days. Until Sunday the 30th @ 6pm, Just in time for a scary good deal.
This came in to the collective as a parts dump.
Stem, bars, seat post and seat are added. Also added a seat post clamp bolt and freewheel.
Not sure of the crank and sprocket.
I think the rest is og.
Frame is straight. Nothing else has been done as far as cleaning or greasing.
Rides as-is
I'm going to run this for 6 days. Until Sunday the 30th @ 6pm, Just in time for a scary good deal.
This came in to the collective as a parts dump.
Stem, bars, seat post and seat are added. Also added a seat post clamp bolt and freewheel.
Not sure of the crank and sprocket.
I think the rest is og.
Frame is straight. Nothing else has been done as far as cleaning or greasing.
Rides as-is
Last edited: